Lead time depends on:
- Tank Size: Larger tanks take longer to fabricate.
- Custom Features: Special designs, fittings, or materials increase build time.
- Material Availability: Delays can happen if materials like stainless steel are in short supply.
- Certification: Tanks built to ASME code go through extra inspection and testing.
- Manufacturer Workload: High demand or limited capacity at the factory can push out delivery timelines.