Cyberjaya: Project CJ-01 (Data Center Cooling)
Scope: Supply and Deliver Chilled water buffer tank.
Capacity: 6 x 12m³ (Total 72m³ Chilled Water Storage)
Key Features/Deliverables:
- High-Efficiency Thermal Storage: Maintains chilled water temperature stability (±0.5°C).
- ASME Certified Vessels: Ensures safety, reliability, and compliance.
- Space-Optimized Design: Custom-fit for site constraints.
- Rapid Deployment: Prefabricated/modular for quick installation.
- Integration Support: Seamlessly connects with chiller plant and BMS.
Cyberjaya: Project CJ-02 (Data Center Backup Cooling)
Scope: Engineered Supply & Delivery of High-Volume Chilled Water Buffer Tanks.
Capacity: 6 x 20m³ (Total 120m³ Chilled Water Reserve)
Work Breakdown:
- Precision Thermal Management: Designed for consistent cooling under heavy IT loads.
- Robust ASME Construction: Built for long-term durability and operational safety.
- Scalable Configuration: Modular design adaptable to facility expansion needs.
- Logistics & Placement Strategy: Expert handling and positioning of large-scale units.
- Interoperability Focused: Prepared for integration with advanced cooling control systems.


Kuala Lumpur: Amex KL-01 (Corporate HQ IAQ Enhancement)
Scope: Comprehensive Upgrade of Indoor Air Quality (IAQ) System.
Work Breakdown:
- Advanced Filtration Implementation: Deployment of MERV-rated filters for superior particle capture.
- Ventilation System Optimization: Recalibration for optimal air exchange rates and energy use.
- Air Purification Technology: Integration of UVGI/PCO units for pathogen and VOC reduction.
- Precision Humidity Control: Installation of humidification/dehumidification systems for occupant comfort.
- Smart IAQ Monitoring: Real-time sensor network for continuous air quality tracking and alerts.
Kuala Lumpur: Menara Prestige KL-02 (Commercial Tower HVAC Retrofit)
Scope: AC System Audit and Ductwork Retrofit for Enhanced Performance.
Key Features/Deliverables:
- In-Depth HVAC Audit: Thorough assessment of system efficiency and operational status.
- Ductwork Redesign & Optimization: Reconfiguration for improved airflow and reduced pressure drop.
- Airflow Balancing & Efficiency Upgrades: Implementation of VAVs and energy-efficient components.
- Leakage Sealing & Insulation: Enhancements to duct integrity for thermal loss prevention.
- Performance Validation: Post-retrofit testing to confirm efficiency gains and comfort levels.


Kuala Lumpur: Berjaya Times Square KL-03 (Retail Complex Chiller Management)
Scope: Full Cycle Supply, Installation, Testing & Commissioning of Chiller Management System.
Work Breakdown:
- Core Hardware Provision: Supply of high-efficiency chillers and advanced DDC controllers.
- Software & Analytics Suite: Deployment of real-time monitoring dashboard with performance analytics.
- Precision Installation: Meticulous mechanical, electrical, and network infrastructure setup.
- Rigorous Testing Phases: Comprehensive pre-commissioning checks and system performance verification.
- System Commissioning & Handover: Functional validation, operational training, and full documentation.
Cyberjaya: TM VADS CJ-04 (Telecommunications Data Center CMS)
Scope: End-to-End Delivery of Chiller Management System including Installation & Commissioning.
Key Features/Deliverables:
- Control System Hardware: Integration of industrial-grade PLCs and sensor arrays.
- Intelligent Software Platform: Implementation of predictive analytics suite for proactive maintenance.
- Specialized Installation: Careful setup ensuring integration with critical IT infrastructure.
- Multi-Stage Testing: Thorough system stress tests and failure mode analysis.
- Compliance & Commissioning: Verification against industry best practices and client specifications, full handover.