Prestressed Concrete: Curing of concrete: T-TEC 7-3E

Curing of concrete:

“The correct temperatures during curing must be proven”

T-TEC 7-3E with a display so that the temperature can be seen as well as logged, with a sacrificial sensor is the ideal way to monitor the temperatures after pouring the concrete. Sacrificial sensors are simple to wire sensors with the precision thermistor, which may be cut and left when the test is over.